
22–26 ft Low-Temp
A compact push-through layout for planned outages and sites with tighter access.
Check project fit →
Service areas
Projects are planned by site, schedule, access and utility requirements. Share the delivery location so the team can confirm equipment and logistics for your operation.

Interactive nationwide coverage
Select a state on the map or from the accessible list, then continue to the service-area guide for project planning.
Select a state on the map or choose from the list below.
Reviewed equipment
Machine type is one part of the decision. The right setup also depends on racks per hour, staff movement, clean and soiled staging, utilities and site access.

A compact push-through layout for planned outages and sites with tighter access.
Check project fit →
More work area for higher service volume and longer operating windows.
Check project fit →
A conveyor-equipped option for demanding institutional and commercial workflows.
Check project fit →Plan with fewer surprises
Temporary facilities work best when equipment and site conditions are reviewed together.
Share daily meals, peak racks, service windows and the items moving through the dish room.
Confirm access, pad conditions, water, power, drainage, wastewater handling and crew circulation.
Review the available trailer, machine type, workflow, delivery plan and rental duration.
Keep your operation moving