
22–26 ft Low-Temp
A compact push-through layout for planned outages and sites with tighter access.
Check project fit →
Government and institutional
Prepare a project brief covering users, meal volume, site utilities, access, schedule and procurement requirements before requesting a formal quote.

Procurement brief
Include the operating location, service population, meal volume, dates, utility conditions, delivery constraints and required procurement or contracting vehicle.
Reviewed equipment
Machine type is one part of the decision. The right setup also depends on racks per hour, staff movement, clean and soiled staging, utilities and site access.

A compact push-through layout for planned outages and sites with tighter access.
Check project fit →
More work area for higher service volume and longer operating windows.
Check project fit →
A conveyor-equipped option for demanding institutional and commercial workflows.
Check project fit →Plan with fewer surprises
Temporary facilities work best when equipment and site conditions are reviewed together.
Share daily meals, peak racks, service windows and the items moving through the dish room.
Confirm access, pad conditions, water, power, drainage, wastewater handling and crew circulation.
Review the available trailer, machine type, workflow, delivery plan and rental duration.
Keep your operation moving